Monthly Splice Check and Maintenance

This monthly splice check ensures the splicer is operating correctly by reviewing splice counts, assessing electrode condition, and determining whether replacement or servicing is required. Performing this maintenance regularly helps maintain splice quality, prevent equipment failures, and support consistent production reliability.
Advanced Navigation
12/01/2025

Monthly Splice Check and Maintenance

Monthly Splice Check and Maintenance

    Check Splice Count

    Enter splice count

    Replace electrodes

    Only replace electrodes if splice count is >5000 (or PE to assess condition of electrode after 5 months)

    Electrode requires replacement?

    PE to assess if Electrode needs to be replaced internally or the splicer needs to be sent out for servicing.

    Any other observations?

Source: Advanced Navigation (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.