30-Day Glass Bead Cabinet Inspection (MOP-059, REV 0)

Conduct and complete this inspection every 30 days to ensure cabinet is working properly.
PGT - Ellisville
11/25/2025

30-Day Glass Bead Cabinet Inspection (MOP-059, REV 0)

This procedure outlines the required 30-day inspection of the glass bead cabinet to confirm all suction lines, air lines, grit components, seals, and protective assemblies are functioning correctly and safely. It ensures that wear, clogs, leaks, or component deterioration are identified early so the cabinet can continue operating efficiently and support consistent production quality.

    2) INSPECT BELLOWS, BOOTS AND GRIT SHIELDS REPLACE/REPAIR ASNEEDED.

    • Pass
    • Flag
    • Fail

    3) INSPECT ALL SUCTION LINES/HOSES FOR WEAR, REPLACE IF NEEDED.

    • Pass
    • Flag
    • Fail

    4) INSPECT ALL AIR LINES, REPLACE IF NEEDED.

    • Pass
    • Flag
    • Fail

    5) INSPECT GRIT FEED HOSES AND VALVES. REPLACE AS NECESSARY.

    • Pass
    • Flag
    • Fail

    7) INSPECT GRIT CAN SEALS. REPLACE AS NECESSARY.

    • Pass
    • Flag
    • Fail

    8) DO AN OVERALL INSPECTION FOR DAMAGE, WEAR. REPAIR AS NEEDED.

    • Pass
    • Flag
    • Fail

    Signature

    Click here to sign
Source: PGT - Ellisville (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.