Back

Monthly Static Grounding System Inspection

Monthly Static Grounding System Inspection is a scheduled evaluation of grounding components used to safely dissipate static electricity in flammable or sensitive environments. It involves checking the integrity of clamps, conductors, and bonding connections to ensure proper electrical continuity and compliance with safety standards. Regular monthly inspections help prevent static discharge incidents, reduce fire and shock risks, and maintain safe, uninterrupted operations across industrial settings.
UNVR - 0681 - Conroe
07/03/2025

Monthly Static Grounding System Inspection

Monthly Static Grounding System Inspection is a scheduled evaluation of grounding components used to safely dissipate static electricity in flammable or sensitive environments. It involves checking the integrity of clamps, conductors, and bonding connections to ensure proper electrical continuity and compliance with safety standards. Regular monthly inspections help prevent static discharge incidents, reduce fire and shock risks, and maintain safe, uninterrupted operations across industrial settings.

    LED Light

    Ensure the LED (green light) on the wall-mounted enclosure is pulsing continuously, indicating a valid ground connection (resistance of 10 ohms or less).

    LED Light

    • Pass
    • Flag
    • Fail

    Visibility

    Confirm the LED is clearly visible to operators, especially in the context of the specific application and environment.

    LED Visibility

    • Pass
    • Flag
    • Fail

    Obstructions

    Check if any product deposits or other materials are covering or impairing visibility of the LED.

    LED Obstructions

    • Pass
    • Flag
    • Fail

    Clamp Connection

    Visually verify that the Bond-Rite clamp is securely attached to the equipment being grounded.

    Clamp Connection

    • Pass
    • Flag
    • Fail

    Cable Condition

    Check for any visible damage, wear, or fraying on the spiral cable

    Cable Condition

    • Pass
    • Flag
    • Fail

    Cable Connections

    Ensure all quick connects are properly attached to the clamp and the indicator station.

    Cable Connections

    • Pass
    • Flag
    • Fail

    Stowage Pin

    Confirm the clamp is returned to the integrated stowage pin when not in use.

    Stowage Pin

    • Pass
    • Flag
    • Fail

    Enclosure Integrity

    Visually inspect the enclosure for any physical damage or signs of environmental ingress (e.g., moisture)

    Enclosure Integrity

    • Pass
    • Flag
    • Fail

    Battery Status (if applicable)

    If the system is battery-powered, check for any low battery indicators. Replace batteries as indicated and/or required. If not applicable, select PASS

    Batteries

    • Pass
    • Flag
    • Fail

    Cleanliness

    Check components for any dirt and/or debris buildup. Wipe down outside of housing box, and cables to remove buildup of dirt/debris. Check clamps for any debris and remove.

    Cleaned

    • Yes
    • No
    • N / A

    Signature

    Click here to sign
Source: UNVR - 0681 - Conroe (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.