Back

SKYJACK Frequent/Periodic/Annual PDI Checklist

Follow this annual inspection procedure of your machine to reduce machine replacement/repair and avoid unnecessary mechanical failures.
Milmar Buildings Takeuchi Trackloader pm
01/25/2024

SKYJACK Frequent/Periodic/Annual PDI Checklist

Follow this annual inspection procedure of your machine to reduce machine replacement/repair and avoid unnecessary mechanical failures.

    Machine Number

    Hourmeter Reading

    Meter name
    Unit

    Date/Time of Inspection

    Labels

    • Pass
    • Flag
    • Fail

    Limit Switches

    • Pass
    • Flag
    • Fail

    Engine and Components

    • Pass
    • Flag
    • Fail

    Engine Intake Air Filter

    • Pass
    • Flag
    • Fail

    Engine Oil

    • Pass
    • Flag
    • Fail

    Radiator

    • Pass
    • Flag
    • Fail

    Fuel Tank & Lines

    • Pass
    • Flag
    • Fail

    Propane Tank & Lines

    • Pass
    • Flag
    • Fail

    Outriggers

    • Pass
    • Flag
    • Fail

    Pothole Protection

    • Pass
    • Flag
    • Fail

    Battery/Hydraulic Tray

    • Pass
    • Flag
    • Fail

    Batteries

    • Pass
    • Flag
    • Fail

    Battery Charger

    • Pass
    • Flag
    • Fail

    Steer Assembly

    • Pass
    • Flag
    • Fail

    Wheel/Tire Assembly

    • Pass
    • Flag
    • Fail

    Axles

    • Pass
    • Flag
    • Fail

    Hydraulic Tank, Pump, Motor & Lines

    • Pass
    • Flag
    • Fail

    Hydraulic Oil

    • Pass
    • Flag
    • Fail

    Manifolds

    • Pass
    • Flag
    • Fail

    Main Power Disconnect Switch

    • Pass
    • Flag
    • Fail

    Base Controls

    • Pass
    • Flag
    • Fail

    Brakes

    • Pass
    • Flag
    • Fail

    Base Weldment

    • Pass
    • Flag
    • Fail

    Grease Points

    • Pass
    • Flag
    • Fail

    Ladder

    • Pass
    • Flag
    • Fail

    Tilt Sensor

    • Pass
    • Flag
    • Fail

    Maintenance Support(s)

    • Pass
    • Flag
    • Fail

    Scissor Assembly & Bumpers

    • Pass
    • Flag
    • Fail

    Sliders & Rollers

    • Pass
    • Flag
    • Fail

    Lift Cylinder(s)

    • Pass
    • Flag
    • Fail

    Angle Transducer

    • Pass
    • Flag
    • Fail

    Scissor Pins

    • Pass
    • Flag
    • Fail

    Mast Assembly

    • Pass
    • Flag
    • Fail

    Chains, Rollers & Control Cables

    • Pass
    • Flag
    • Fail

    Wear Pads

    • Pass
    • Flag
    • Fail

    Railings and Gate

    • Pass
    • Flag
    • Fail

    Fall-Protection Anchorage

    • Pass
    • Flag
    • Fail

    AC Power Socket

    • Pass
    • Flag
    • Fail

    Platform Control Console

    • Pass
    • Flag
    • Fail

    Manual Storage Box

    • Pass
    • Flag
    • Fail

    Powered Extension Control Console

    • Pass
    • Flag
    • Fail

    Extension Platform

    • Pass
    • Flag
    • Fail

    Electrical Components

    • Pass
    • Flag
    • Fail

    Function Tests

    • Pass
    • Flag
    • Fail

    Comments

    Signature

    Click here to sign
Source: Milmar Buildings Takeuchi Trackloader pm (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.