Back

WW PM 2-Month Floc to DAF Pump CP-3 Hayward Gordon SmartFlex.

The 2-Month PM for the Floc to DAF Pump CP-3 (Hayward Gordon SmartFlex) helps maintain optimal pumping efficiency, ensures consistent floc transfer, and reduces the risk of clogs or mechanical wear. Regular servicing improves reliability, extends pump life, prevents unplanned downtime, and supports stable DAF system performance for effective water treatment.
087
05/09/2025

WW PM 2-Month Floc to DAF Pump CP-3 Hayward Gordon SmartFlex.

The 2-Month PM for the Floc to DAF Pump CP-3 (Hayward Gordon SmartFlex) helps maintain optimal pumping efficiency, ensures consistent floc transfer, and reduces the risk of clogs or mechanical wear. Regular servicing improves reliability, extends pump life, prevents unplanned downtime, and supports stable DAF system performance for effective water treatment.

    Food Safety Pre-Check

    *** LOTO Confirmation Statement - DO NOT EDIT/REMOVE ***

    All hazardous energy has been isolated using LOTO procedures?

    All potential stored or residual energy has been relieved, disconnected, restrained, lowered, and/or otherwise rendered safe?

    Pump Unit

    Food Safety Post-Check

Source: 087 (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.