Fire Pump Weekly Inspection and Test
A weekly inspection and operational test of the fire pump to verify startup performance, flow rate, discharge pressure, and overall mechanical condition, ensuring the pump remains fully operational, properly maintained, and ready for reliable deployment in the event of a fire suppression emergency.
Fire Pump Weekly Inspection and Test
This procedure outlines the process for conducting a fire pump test by verifying system readiness, monitoring pump operation, and recording key pressure and electrical readings before and during the test. It helps ensure the fire pump system is functioning correctly and that all signals, safety components, and performance indicators meet operational requirements.
800-333-1830 | Unicom Monitoring
Did Fire Pump Start automatically?
Did Jockey Pump start automatically?
Pump Running/Signal sent to panel?
Fire Panel Ready Normal?
Suction Pressure Before Test
Suction Pressure During Test
Discharge Pressure Before Test
Discharge Pressure During Test
Relief Valve Flow
Pump Packing
AC Before Test
AC During Test
Fire Pump Controller in auto
Any Trouble Lights on?
Cooling water flowing
Panel Readings || PSI Before Test
Panel Readings || PSI During Test
Panel Readings || Hertz Before Test
Panel Readings || Hertz During Test
Panel Readings || Volts 1 Before Test
Panel Readings || Volts 1 During Test
Panel Readings || Volts 2 Before Test
Panel Readings || Volts 2 During Test
Panel Readings || Volts 3 Before Test
Panel Readings || Volts 3 During Test
Panel Readings || Amps 1 Before Test
Panel Readings || Amps 1 During Test
Panel Readings || Amps 2 Before Test
Panel Readings || Amps 2 During Test
Panel Readings || Amps 3 Before Test
Panel Readings || Amps 3 During Test