Back

Monthly Maintenance for Automatic Powder Fire Extinguisher System of Blocks P, B, Z, O, Y.

Checking your fire extinguishers regularly can help ensure that your area and personnel are ready to extinguish flames.
GULTEKIN TEKNIK LIMITED COMPANY
12/27/2023

Monthly Maintenance for Automatic Powder Fire Extinguisher System of Blocks P, B, Z, O, Y.

Checking your fire extinguishers regularly can help ensure that your area and personnel are ready to extinguish flames.

    1.1. Check the control panel for power supply, for any hardware fault signals, check the operation of the panel indicators, buttons, internal and external audible alarms by switching the panel to test mode.

    Add or drag pictures

    1.2. Unplug the panel and remove dust, dirt and other contaminants from the surface of the panel using a debris brush.

    Add or drag pictures

    1.3. Remove top cover panels And clear All terminals from dirt , dust And corrosion With with help brushes For removal waste And solvent on oil basis _

    Add or drag pictures

    1.5. Measure the voltage at each battery output. If the voltage value drops below 12 V (the total voltage output on both batteries should not be below 24 V), replace both backup batteries.

    Add or drag pictures

    1.6. Check the rating of fuse F1 (0.5A) and ease of use.

    Add or drag pictures

    1.7. Carry out a general inspection of the condition of the powder extinguishing cylinder for any malfunctions, fastenings, condition of pressure gauges, if necessary, clean by removing dirt/dust using a clean, dry, lint-free cloth.

    Add or drag pictures

    1.8. Adjust dates and times in the programming menu of the S2000-ASPT control unit

    Add or drag pictures

    1.9. Download all archived data from the previous inspection to the current day and attach it in PDF format along with the report.

    Add or drag pictures

    1.10.       Check if it's correct whether grounded panel And OK whether the wire grounding _

    Add or drag pictures

    1.11.       Make sure that connection external chains corresponds on days off terminals panels using _ diagram connections panels _

    Add or drag pictures

    Note : In case receiving How minimum two alarming signals V flow months to carry out the following procedures:

Source: GULTEKIN TEKNIK LIMITED COMPANY (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.