Shaker Commissioning Procedure
This procedure ensures a shaker machine is fully inspected and cleared as safe and operational before it resumes production.
Shaker Commissioning Procedure
This procedure verifies a shaker machine is safe, compliant, and fully operational before it returns to production, covering visual, hydraulic, cooling, air, clamp assembly, lubrication, electrical, structural, and undercarriage checks along with operator feedback and issue escalation.
Machine Information
Date of First Operation
Machine Hours
Operator Name
Inspection Completed By
General Visual Inspection
Upload general machine photo (front + side)
Add or drag pictures
Notes
Hydraulic System Check
Upload photo of hydraulic manifold / hose routing
Add or drag pictures
Notes
Cooling System / Engine Bay
Upload engine bay / coolant system photo
Add or drag pictures
Notes
Air System (Critical)
Upload airline routing photo
Add or drag pictures
Notes
Shaker Head / Clamp Assembly
Upload clamp head / pads photo
Add or drag pictures
Notes
Greasing & Lubrication
Notes
Electrical / Controls
Upload display screen photo showing no faults
Add or drag pictures
Notes
Structural / Frame Inspection
Upload photo of frame / mounting points
Add or drag pictures
Notes
Wheels / Undercarriage (If Applicable)
Notes
Operator Feedback
Operator Comments
Issues Found & Escalation
Were any issues identified during this inspection?
Upload issue photo(s)
Add or drag pictures
Issue Description
Corrective Action Taken
Final Sign-Off
Inspector Name
Signature
Click here to sign
Date Completed