Back

JLG | Scissor Lifts 1532R - Pre-Start Inspections

Pre delivery inspection checklists are proven to help prevent issues with your Liftpods. Proper inspections will always lead to better quality of the life of your equipment and reduce costs.
MaintainX
10/12/2022

JLG | Scissor Lifts 1532R - Pre-Start Inspections

Pre delivery inspection checklists are proven to help prevent issues with your Liftpods. Proper inspections will always lead to better quality of the life of your equipment and reduce costs.

    The Pre-Start Inspection should include each of the following:

      Cleanliness

      Check all surfaces for leakage (oil or battery fluid) or foreign objects. Report this to the proper maintenance personnel.

      • Pass
      • Flag
      • Fail

      Structure

      Inspect the machine structure for dents, damage, weld or parent metal cracks or other discrepancies. Report this to the proper maintenance personnel.

      • Pass
      • Flag
      • Fail

      Decals and Placards

      Check all for cleanliness and legibility. Ensure none of the decals and placards are missing. Ensure all illegible decals and placards are cleaned or replaced.

      • Pass
      • Flag
      • Fail

      Operation and Safety Manuals

      Ensure that a copy of the Operation and Safety Manual, AEM Safety Manual (ANSI markets only), and ANSI Manual of Responsibilities (ANSI markets only) is enclosed in the weather resistant storage container.

      • Pass
      • Flag
      • Fail

      “Walk-Around” Inspection

      Battery

      Charge as required.

      • Pass
      • Flag
      • Fail

      Hydraulic Oil Level

      Check the hydraulic oil level in the pump reservoir, add as required.

      • Pass
      • Flag
      • Fail

      Accessories/Attachments

      Refer to the Accessories section in this manual or the accessory installed upon the machine for specific inspection, operation, and maintenance instructions.

      • Pass
      • Flag
      • Fail

      Function Check

      Once the “Walk-Around” Inspection is complete, perform a functional check of all systems in an area free of overhead and ground level obstructions. Refer to Section 3 for more specific instructions on the operation of each function

      • Pass
      • Flag
      • Fail

      Platform Gate

      Keep gate and surrounding area clean and unobstructed. Check that gate closes properly and is not bent or damaged. During operation keep gate closed.

      • 1.PNG
      • Pass
      • Flag
      • Fail

      Lanyard Anchorage Points

      JLG Industries, Inc. recommends personnel in the platform wear a full body harness with a lanyard attached to an authorized lanyard anchorage point (1).

      • 2.png
      • Pass
      • Flag
      • Fail
    Source: MaintainX (Community Member)

    Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.