GM Furnace 9 Point-182
This procedure provides step-by-step guidance for performing a 9-point inspection on the GM Furnace. It includes validation of run numbers, coordination with engineering and quality, and documentation of calibration results.
GM Furnace 9 Point-182
This procedure provides step-by-step guidance for performing a 9-point inspection on the GM Furnace. It includes validation of run numbers, coordination with engineering and quality, and documentation of calibration results.
Procedure Max Score: 1
Enter Run Number
Due Date
Date Of Completion
Verify through engineering and quality that the run is conforming
Click here to sign
Source: Platinum Aluminide (Community Member)