Back

WW PM 24-Month EQ Blower B-1 Aerzen

Maintenance inspections can identify minor issues before they turn into costly repairs. Inspections ensure machines are working correctly and helps prevent equipment downtime.
087
04/28/2025

WW PM 24-Month EQ Blower B-1 Aerzen

Maintenance inspections can identify minor issues before they turn into costly repairs. Inspections ensure machines are working correctly and helps prevent equipment downtime.

    Food Safety Pre-Check

    Complete other PMs.

    *** LOTO Confirmation Statement - DO NOT EDIT/REMOVE ***

    All hazardous energy has been isolated using LOTO procedures?

    All potential stored or residual energy has been relieved, disconnected, restrained, lowered, and/or otherwise rendered safe?

    If belts have not been replaced in past 24 months, then replace.

    Inspect the non-return flap for wear and tightness.

    ‼️DEPRESSURIZE PIPELINES BEFORE CONTINUING‼️

    Inspect flexible pipelines.

    ‼️RISK OF SCALDING FROM HOT OIL‼️

    Drain the Delta Lube 06 oil.

    Fill the Delta Lube 06 oil.

    Food Safety Post-Check

Source: 087 (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.