Back

CAF Inspection Checklist

This procedure is used to verify that a CAF unit is mechanically sound, compatible with the chemicals to be processed, and fully equipped with spare parts before it is deployed to the field.
Envent Corporation
02/19/2026

CAF Inspection Checklist

This procedure outlines the pre-deployment inspection of a CAF (Cavitation Air Flotation) unit to confirm it is safe and ready for field use. It guides the inspector through checks of the electrical panel, tanks, aerator, wipers, pumps, and chemical compatibility, followed by a job box contents check and inspector and supervisor sign-off.

    EQUIPMENT PREPARATION & INSPECTION CHECKLIST

    Inspector/s:

    Supervisor:

    Date of Inspection:

    CAF - CAVITATION AIR FLOTATION - #

    Chemicals to be Processed:

    Chemicals PH:

    1. Have inspected inside and outside the panel for corrosion/loose wires?

    • Pass
    • Flag
    • Fail

    2. Have inspected all tanks for deterioration/corrosion? All clean?

    • Pass
    • Flag
    • Fail

    3. Were the wiper mounting blocks replaced/inspected? (Date:)

    • Pass
    • Flag
    • Fail

    4. Is the CAF Unit compatible with the chemicals to be processed?**

    • Pass
    • Flag
    • Fail

    5. Has the aerator been tested? All functional?

    • Pass
    • Flag
    • Fail

    6. Have the hoger/wipers/chain been tested/inspected? All functional?

    • Pass
    • Flag
    • Fail

    7. Have the LMI pumps been tested? All functional?

    • Pass
    • Flag
    • Fail

    8. Has the sludge pump been tested? Does it have all the fittings needed for the job?

    • Pass
    • Flag
    • Fail

    9. Has the poly tank been inspected and clean? Is the poly tank compatible with the chemicals to be processed?** (if applicable)

    • Pass
    • Flag
    • Fail

    10. Ensure job box contains:

    • Pass
    • Flag
    • Fail

    QTY 1 pH Strips and/or Probe

    QTY 1 Box of Glass Jars

    26 FT Chain belt for the auger

    QTY 12 Wipers Mounting Blocks

    QTY 6 Spare shoulder bolts for the sprockets

    QTY 1 Spare parts for the LMI pumps

    QTY 1 Extra fittings for the Sludge Pump

    *Under normal usage wiper mounting blocks should be replaced every 24 months and inspected after every job to assess the condition of the acetal components.

    **Contact Project Engineer if you are unsure of material compatibility

    By signing this document, I agree that I have performed and completed a full inspection on this equipment, and I have verified that all requirements have been met for this equipment to perform its function in the field.

    Inspector/s Signature:

    Click here to sign

    Supervisor Signature:

    Click here to sign
Source: Envent Corporation (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.