Back

JLG Vertical Mast 15BD: Daily Walk-Around Inspection

As with all heavy equipment, it’s important to inspect and maintain your telehandlers to ensure they’re running efficiently and improving your productivity. This checklist will help you in inspecting these machines at the start of every day, at shift changes and any time a new operator takes over the machine.
MaintainX
10/13/2022

JLG Vertical Mast 15BD: Daily Walk-Around Inspection

As with all heavy equipment, it’s important to inspect and maintain your telehandlers to ensure they’re running efficiently and improving your productivity. This checklist will help you in inspecting these machines at the start of every day, at shift changes and any time a new operator takes over the machine.

    Base Frame

    Manual Descent Control Valve

    Motor/Pump/Reservoir Power Unit

    Ground Controls

    Mast Assembly

    AC Voltage Junction Box

    Platform Controls

    Platform Control Foot Switches (optional)

    Platform Assembly

    Hourmeter

Source: MaintainX (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.