Back

JLG Vertical Mast 1030P: Daily Walk-Around Inspection

As with all heavy equipment, it’s important to inspect and maintain your and vertical mast to ensure they’re running efficiently and improving your productivity. This checklist will help you in inspecting these machines at the start of every day, at shift changes and any time a new operator takes over the machine.
MaintainX
10/13/2022

JLG Vertical Mast 1030P: Daily Walk-Around Inspection

As with all heavy equipment, it’s important to inspect and maintain your and vertical mast to ensure they’re running efficiently and improving your productivity. This checklist will help you in inspecting these machines at the start of every day, at shift changes and any time a new operator takes over the machine.

    Platform Control Panel

    Lanyard Attach Points

    Rear Wheels (Auto-locking brakes)

    Battery Isolator

    Bubble level indicator.

    Gate/Gate latch.

    Arm Stack Assembly.

    Emergency Stop Button.

    Hydraulic System, Emergency Lowering Valve, Battery Charger (under cover):

    Hydraulic System

    Emergency Lowering Valve

    Battery Charger

    Ground Control Panel.

    Battery

Source: MaintainX (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.