D - Fixed Grip Daily Pre-Op Inspection
This procedure outlines the daily pre-operational inspection steps for the Fixed Grip lift, ensuring all systems are functional and safe before public use.
D - Fixed Grip Daily Pre-Op Inspection
This procedure outlines the daily pre-operational inspection steps for the Fixed Grip lift, ensuring all systems are functional and safe before public use.
Pre-Operational Inspection
Enter Lift Name and Date of Inspection
Select Day of Inspection
Enter Lift Hours
Terminal and Area
Tension and Drive System
Record carriage position and Tension pressure (if equipped)
Meter name
Unit
Verify proper battery(s) voltage
Meter name
Unit
Line and Carrier
Check gearbox oil level
Meter name
Unit
Mid-Day and Closing Procedures
Sign/time of inspection
Click here to sign
Incidents, Abnormal Occurrences, Comments, ETC.
Closing Procedure Completed By
Click here to sign
Source: Lift Maintenance Sandbox - Vail Resorts (Community Member)
