Back

Scissor lift - Monthly

A monthly inspection of the scissor lift to evaluate all critical hydraulic, mechanical, and safety components, ensuring the equipment remains in safe operating condition and fully compliant with applicable workplace safety standards for elevated work platform operations.
Oshkosh Defense - Harrion St
09/10/2026

Scissor lift - Monthly

This procedure ensures that the scissor lift undergoes a comprehensive monthly inspection covering hydraulic systems, safety devices, platform integrity, wheel and brake condition, control functionality, and battery or fuel levels, maintaining safe and reliable elevated work platform performance, preventing mechanical failures, and supporting compliance with applicable workplace safety regulations and manufacturer maintenance requirements.

    Preparation

    * Safety Glasses * Steel Toe boots / shoes * Hearing Protection (if required in area) * Appropriate gloves (as necessary) * Lock Out / Tag Out (as necessary)

    -General Tool Bag - General Cleaning solution - Rags - Distilled water - Battery terminal wire brush - Oil

    Procedure

    Clean and inspect lift

    Inspect for loose electrical, pneumatic, hydraulic connections, wear, damage or leaks Repair as necessary Flag - less than 30 min repair Fail - greater than 30 min repair

    • Pass
    • Flag
    • Fail

    Tighten as needed, for anything else inform Maintenance Supervisor & conger for repairs.

    Inspect pin retainer pin for damage.

    Add a little Oil for Lubrication.

    • Pass
    • Flag
    • Fail

    Inspect batteries for proper water level

    Add distilled water as needed (disregard for maintenance free batteries)

    • Pass
    • Flag
    • Fail

    Clean and inspect battery terminals for proper connection or corrosion

    • Pass
    • Flag
    • Fail

    Check all fluids for proper fill levels

    Add as necessary

    • Pass
    • Flag
    • Fail

    Functional check of all Safety stops

    Flag - less than 30 min repair Fail - greater than 30 min repair

    • Pass
    • Flag
    • Fail

    Final Checks

    * Re-install any Panels or components that were removed during maintenance. * Remove Lockout Tagout (As Necessary) * Energize all power sources (As Necessary) * Return Asset to Operating Condition (As Necessary) * Visually confirm that equipment powered on as intended

    Technician Signature

    By signing this form, you acknowledge that you have completed the Work Order to the best of your ability.

    Click here to sign
Source: Oshkosh Defense - Harrion St (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.