Conveyor Section Yearly Inspection- Single S-Bend Yearly Inspection

This yearly inspection focuses on the structural and mechanical integrity of the Single S-Bend section of the conveyor system. The procedure includes checking for wear on rollers, belts, bearings, and guides specific to the S-bend curve. Inspectors verify alignment, tension, and support brackets, ensuring that the curve section operates smoothly without causing material jams or belt misalignment. Any signs of excessive wear, corrosion, or structural fatigue are documented and addressed. This inspection ensures continued safe and efficient operation of the conveyor and prevents unexpected downtime.
Protedyne - Global
08/07/2025

Conveyor Section Yearly Inspection- Single S-Bend Yearly Inspection

This yearly inspection focuses on the structural and mechanical integrity of the Single S-Bend section of the conveyor system. The procedure includes checking for wear on rollers, belts, bearings, and guides specific to the S-bend curve. Inspectors verify alignment, tension, and support brackets, ensuring that the curve section operates smoothly without causing material jams or belt misalignment. Any signs of excessive wear, corrosion, or structural fatigue are documented and addressed. This inspection ensures continued safe and efficient operation of the conveyor and prevents unexpected downtime.

    S-Bend - Measure horizontally at the apex of the plain bend curve with the rub rail in place. If the measurement is less than 10.80mm, the rub rail must be replaced.

    • Pass
    • Flag
    • Fail
    if the answer is "oneOf [FAIL]"

    Rubrail Replaced

    S-Bend - IF RUB RAIL IS WORN THROUGH - Measure upper and lower flanges. If measurement is 9.3 or greater it can remain in service, less than 9.3 the plain bend must be replaced.

    • Pass
    • Flag
    • Fail
    if the answer is "oneOf [FAIL]"

    Plain Bend Replaced?

    Plain Bend 1 Flange Top (enter value below)

    Plain Bend 1 Flange bottom (enter value below)

    Plain Bend 2 Flange Top (enter value below)

    Plain Bend 2 Flange bottom (enter value below)

    Plain Bend 1 Top (enter value below)

    Plain Bend 1 Bottom (enter value below)

    Plain Bend 2 Top (enter value below)

    Plain Bend 2 Bottom (enter value below)

Source: Protedyne - Global (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.