Back

WW PM 3-Month Coag Pump CP-1 Calibration / Zero LMI

The 3-month PM for Coag Pump CP-1 calibration and LMI zeroing ensures precise chemical dosing, prevents process deviations, maintains effluent quality compliance, and extends pump lifespan by catching wear early.
087
05/08/2025

WW PM 3-Month Coag Pump CP-1 Calibration / Zero LMI

The 3-month PM for Coag Pump CP-1 calibration and LMI zeroing ensures precise chemical dosing, prevents process deviations, maintains effluent quality compliance, and extends pump lifespan by catching wear early.

    Food Safety Pre-Check

    Turn the pump off. Top off the graduated cylinder and note the starting volume measurement.

    Turn the pump on. Count the number of strokes for exactly one minute, then switch the pump off. Note the number of strokes.

    Note the ending volume measurement in the graduated cylinder.

    Divide the volume suctioned (in ml) by the number of strokes in one minute.

    Food Safety Post-Check

Source: 087 (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.