Back

SILO COOLING WATER

TURNING COOLING WATER ON TO SILO'S #201, 202, 203 IN THE SPRING
Norfolk, NE
04/13/2023

SILO COOLING WATER

TURNING COOLING WATER ON TO SILO'S #201, 202, 203 IN THE SPRING

    ENSURE THAT THE 4 DRAIN VALVES ARE CLOSED

    • Image4.jpeg
    • Image5.jpeg
    • Image6.jpeg
    • Image7.jpeg

    SLOWLY OPEN EACH SUPPLY LINE WHEN YOU HERE IT EQUALIZE OPEN THE VALVE UP 100% THERER ARE 3 SUPPLY LINES

    • Image1.jpeg
    • Image2.jpeg

    OPEN THE BY PASS VALVE

    • Image3.jpeg

    EACH SUPPLY LINE HAS A TRIAC ACTUATOR, AFTER MANUAL SUPPLY VALVES ARE OPENED GET WITH PRODUCTION SUPERVISOR AND MAKE SURE EACH ACTUATOR FUNCTIONS

    WALK AROUND EACH SILO OUT SIDE AND INSPECT THE COOLING JACKETS FOR LEAKS ONCE COOLING VALVES ARE OPEN

Source: Norfolk, NE (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.