Back

KO Pot Inspection Checklist

A structured inspection of the KO Pot to evaluate vessel condition, valve functionality, and separation performance, ensuring the equipment operates safely and reliably within the process system and remains compliant with applicable inspection and safety requirements.
Envent Corporation
08/26/2026

KO Pot Inspection Checklist

This procedure ensures that the KO (Knockout) Pot is systematically inspected for vessel integrity, drain valve functionality, level indicators, pressure relief devices, and inlet and outlet connections, maintaining safe and effective liquid and vapor separation performance, preventing carryover or pressure-related incidents, and supporting compliance with applicable process safety and equipment inspection standards.

    Equipment Information

    Equipment ID

    Date

    Location

    MAWP (If no MAWP put NA)

    PRV Set Pressure (Put NA if no PRV or VRV is installed or required)

    Inspector

    Safety & Isolation

    Vessel isolated and depressurized

    • Yes
    • No
    • N / A

    Vessel drained and gas-freed

    • Yes
    • No
    • N / A

    Test area barricaded and posted

    • Yes
    • No
    • N / A

    External Condition

    Vessel shell free of visible damage or deformation

    • Pass
    • Flag
    • Fail

    Supports, legs, or skid structurally sound

    • Pass
    • Flag
    • Fail

    Connections & Nozzles

    Inlet and outlet flanges in good condition, no damage or corrosion to the face of the flange

    • Pass
    • Flag
    • Fail

    Drain valve functional and unobstructed

    • Pass
    • Flag
    • Fail

    Caps and plugs installed on all open ended connections

    • Pass
    • Flag
    • Fail

    All gauges are in good condition and operational.

    • Pass
    • Flag
    • Fail
    if the answer is "noneOf [PASS]"

    Replace gauges as needed. Verify operability.

    Is the sight glass magnetic or have instrumentation?

    if the answer is "oneOf [Yes]"

    Is the liquid level clearly readable on the level gauge? (scale clean, indicator visible)

    • Pass
    • Flag
    • Fail

    Does the level indicator move as the level changes? (not stuck)

    • Pass
    • Flag
    • Fail

    Is the level gauge free of leaks at the upper and lower connections and the vent/drain?

    • Pass
    • Flag
    • Fail

    Is the level gauge free of damage, corrosion, and loose mounting?

    • Pass
    • Flag
    • Fail

    Are the level gauge isolation valves fully open? (if fitted)

    • Pass
    • Flag
    • Fail

    Do the indicator flags show a clear level line? (yellow = liquid, black = vapor)

    • Pass
    • Flag
    • Fail

    MAGNETIC LEVEL GAUGE ACCURACY CHECK

    Accuracy verification using a known water volume.

    Record the level gauge reading and the inspection result below.

    PASS if Within 2″ of 10.78″ FLAG if 2″ to 5″ off FAIL if More than 5″ off

    • Pass
    • Flag
    • Fail

    Sight glass tubing is clean and visible

    • Pass
    • Flag
    • Fail
    if the answer is "noneOf [PASS]"

    Replace or clean as needed.

    Are all fittings compatible with the KO Pot metallurgy? SS KO Pots should ONLY have SS fittings, CS can have CS or Galvanized fittings.

    • Pass
    • Flag
    • Fail

    Internal Condition (If Applicable)

    No excessive corrosion, debris, or sludge inside of the KO Pot.

    • Pass
    • Flag
    • Fail

    Verify Demister pad is in place.

    • Pass
    • Flag
    • Fail

    Inlet diverter / baffle intact

    • Yes
    • No
    • N / A

    Relief Valve Status

    Verify if the KO needs a PRV or VRV. If no PRV or VRV is Needed select NA.

    Verify if the KO needs a PRV or VRV. If no PRV or VRV is Needed select NA

    • Yes
    • No
    • N / A
    if the answer is "oneOf [Yes]"

    Relief valve installed and oriented correctly?

    • Yes
    • No
    • N / A

    Relief valve certification tag legible

    • Yes
    • No
    • N / A

    Test Date

    Next Due

    Certification Status

    if the answer is "oneOf [No – Expired]"

    Replace RV with a RV that has a current inspection. If none in stock, create a work order to have a RV installed and red tag the vessel.

    Pneumatic Pressure-Up & Relief Valve Leak Check (If No PRV Select N/A)

    PRESSURE LIMIT (CRITICAL) Maximum test pressure = the LOWER of: Normal operating pressure. ≤ 90% of PRV set pressure. ❌ Never approach or exceed PRV set pressure ❌ The PRV must not lift during this check Example: PRV set pressure = 200 psig Max leak‑check pressure = 180 psig (90%)

    Connect regulated compressed air source. Confirm Pressure gauge on vessel is functioning.

    • Yes
    • No
    • N / A
    if the answer is "noneOf [Yes]"

    Whip Check installed at Air Connection point.

    • Pass
    • Flag
    • Fail

    Using Compressed air, pressure increase slowly in stages (25%, 50%, 75%). Final target pressure (≤ 90% PRV set). Pause at each stage for: Audible leak checks and Visual observations.

    • Pass
    • Flag
    • Fail

    Final pressure held for minimum 10 minutes

    • Pass
    • Flag
    • Fail

    Leak detection solution applied at

    Relief valve shows no leakage, bubbling, or or pressure drop off?

    • Pass
    • Flag
    • Fail

    Relief valve did not lift or chatter?

    • Pass
    • Flag
    • Fail

    Test Pressure Used

    Confirm Pressure Limits

    Pressure reduced slowly and controlled

    • Yes
    • No
    • N / A

    Vessel fully depressurized to 0 psig

    • Yes
    • No
    • N / A

    Acceptance & Disposition FAIL (ANY of the following) Continuous bubbling Pressure slowly decays Audible passing through PRV PRV lifts or chatters A failed PRV shall be removed from service and replaced or recertified. PASS Pressure remains stable No visible bubbles No audible leakage PRV does not lift or simmer

    Pneumatic leak check results acceptable

    • Pass
    • Flag
    • Fail

    Relief valve acceptable for continued service

    • Pass
    • Flag
    • Fail

    Return to Service

    Lid is intact, gasket, all bolts are in good condition?

    • Pass
    • Flag
    • Fail
    if the answer is "noneOf [PASS]"

    Replace and install new componenets as needed.

    KO Pot approved for return to service and green tagged?

    • Pass
    • Flag
    • Fail

    Corrective work order required

    • Yes
    • No
    • N / A

    Inspector Comments

    Comments

    Inspector Signature

    By signing below, I agree that I have performed and completed the KO Pot inspection above, and I have recorded the results accurately.

    Click here to sign
Source: Envent Corporation (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.