Back

Daikin NAVIGATOR® WATER-COOLED SCREW CHILLER (WMV): Weekly Maintenance

This weekly maintenance procedure helps you check the general functions of your equipment, clean the box fan filter and lubricate regrigeration.
MaintainX
08/10/2022

Daikin NAVIGATOR® WATER-COOLED SCREW CHILLER (WMV): Weekly Maintenance

This weekly maintenance procedure helps you check the general functions of your equipment, clean the box fan filter and lubricate regrigeration.

    Operation

    General:

    Electrical ( * including the VFDs)

    Refrigeration/Lubricant

    NOTE: 1 Monthly operations include all weekly operations. 2 Annual (or spring startup) operations include all weekly and monthly operations. 3 Log readings can be taken daily for a higher level of unit observation. 4 Replace the filter if pressure drop exceeds 20 psi. 5 The weekly fan filter cleaning schedule can be modified to meet job conditions. It is important that the filter allows full air flow.

Source: MaintainX (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.