Cleaver Brooks Electric Boiler - WB 750-136 Annually Maintenance

MaintainX
04/26/2021

Cleaver Brooks Electric Boiler - WB 750-136 Annually Maintenance

    Element Replacement Procedure

    Heating Elements

    Element Replacement

    Warning: Before element replacement, make certain the boiler is drained below the element opening and lock out and disconnect the boiler’s main power to avoid the hazard of electrical shock, which could result in serious personal injury or death.

    NOTE: To assist in breaking free the gasket, insert one of the flange bolts into the tapped hole provided.

    NOTE: Since the elements often differ in length, check to assure that there is an adequate clearance (3/4” min.) between the end of the element and the opposite side vessel wall.

    Check by measuring both the element extension (from flange to tip) and the distance from the tank flange face to the vessel wall.

    You will feel the ferrule separate from the nut while tightening. A properly tightened ferrule nut will have separated from its ferrule and the ferrule will be squeezed or compressed onto the element sheath, thus providing a tight seal.

    FIGURE 4-3. Element Installation Details

Source: Cleaver Brooks

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.