Back

EMC 110/B10 Electric Walkie Stacker 1000 Hours/6 Months

The EMC 110/B10 Electric Walkie Stacker 1000 Hours/6 Months ensures the long lasting performance of your stacker. Preserve the quality of your stacker by using this checklist.
MaintainX
04/26/2021

EMC 110/B10 Electric Walkie Stacker 1000 Hours/6 Months

The EMC 110/B10 Electric Walkie Stacker 1000 Hours/6 Months ensures the long lasting performance of your stacker. Preserve the quality of your stacker by using this checklist.

    Chassis / superstructure:

    Drive unit:

    Wheels:

    Check for wear and damage

    Tyres:

    Steering / brake system:

    Lifting device:

    Hydraulic system:

    Performance check

    Check hydraulic cylinders for :

    Filler plug for hydraulic oil

    Electrical system:

    Electric motors:

    Batteries:

Source: Jungheinrich

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.