AGN-W-ESXi-1 Shutdown Procedure
A defined shutdown procedure for AGN-W-ESXi-1 is critical to ensure systems are powered down safely and in the correct sequence. Following this checklist helps prevent data loss, hardware damage, and service disruptions, while enabling a smoother and more reliable restart when operations resume.
AGN-W-ESXi-1 Shutdown Procedure
The aim is to ensure the safe, controlled, and orderly shutdown of the ESXi host to prevent data loss, system corruption, or hardware damage. The procedure provides clear steps to properly stop virtual machines and related services before shutdown, ensuring system integrity, minimizing operational risk, and supporting efficient recovery when the system is brought back online.
Login to VSC Server
AGN-W-CBX-SRV-1
AGN-W-CBX-SRV-1
AGN-W-SCH-TEST
AGN-W-SCH-TEST
AGN-W-ACU-1
Antenna Control Unit for Antenna 1
AGN-W-ACU-1
AGN-W-ACU-2
Antenna Control Unit for Antenna 2
AGN-W-ACU-2
AGN-W-AD_Server_DC1
AGN-W-AD_Server_DC1
AGN-W-BVMS-MVS
AGN-W-BVMS-MVS
AGN-W-CONFIGMAN-01
AGN-W-CONFIGMAN-01
AGN-W-CSAPP02
AGN-W-CSAPP02
AGN-W-CSAPP03
AGN-W-CSAPP03
AGN-W-CSAPP04
AGN-W-CSAPP04
AGN-W-MSSQL
Shut already be powered off, but if not
AGN-W-MSSQL
AGN-W-NMS
Shut already be powered off, but if not
AGN-W-NMS
AGN-W-OPSAPP01
Shut already be powered off, but if not
AGN-W-OPSAPP01
AGN-W-PROAG01
Shut already be powered off, but if not
AGN-W-PROAG01
AGN-W-PROXY-1
Shut already be powered off, but if not
AGN-W-PROXY-1
AGN-W-CPPM-P
AGN-W-CPPM-S must be shutdown before this VM is shutdown
AGN-W-CPPM-P
AGN-W-VCSA67
This VM MUST BE the last VM shut down This VM must be shutdown from the ESXi-1 host directly
AGN-W-VCSA67
Final Actions for AGN-W-ESXi-1
FINAL POWER DOWN ACTIONS for AGN-W-ESXi-1
Source: Capricorn Space Pty Ltd (Community Member)
