Contractor Worksite Safety Inspection

This procedure is used to inspect a high-hazard contractor’s worksite for safety compliance. It covers general site safety, PPE, fire prevention, elevated work, excavation, confined space, hazard communication, electrical safety, and records.

    General Information

    Contractor

    Enter the contractor that is being inspected, i.e., Mid America Liner, Nail Excavating, etc.

    Name of person conducting inspection

    General Site Safety

    Have all contract employees on-site completed the Roeslein EHS Contractor and site-specific orientation?

    • Pass
    • Flag
    • Fail

    Have all contract employees signed the site sign-in log?

    • Pass
    • Flag
    • Fail

    Job Hazard Analysis (JHA) / Job Safety Analysis (JSA)

    Has the JHA/JSA been completed for work to be performed and reviewed with all involved employees?

    • Pass
    • Flag
    • Fail

    Personal Protective Equipment (PPE)

    Are all required PPE - safety glasses, hearing protection, boots, gloves, etc., present, worn properly, and in safe, working condition, as required?

    • Pass
    • Flag
    • Fail

    Are Fire Retardant garments and 4-gas personal meters worn and used properly, as required?

    • Pass
    • Flag
    • Fail

    Housekeeping and Fire Prevention

    Are exit paths maintained, cords out of walking paths, debris clear, etc.?

    • Pass
    • Flag
    • Fail

    Are hot-work permits, fire watches, clear work zones, flammable containment, and other fire prevention practices acceptable?

    • Pass
    • Flag
    • Fail

    Are fire extinguishers present, charged, and inspected?

    • Yes
    • No
    • N / A

    Cover Repair

    Are Cover Entry and Repair procedures and requirements being followed by the contractor?

    • Yes
    • No
    • N / A

    Is all required equipment used for cover repairs present and in safe, working order (refer to Cover Repair Procedures)?

    • Yes
    • No
    • N / A

    Elevated Work

    Are fall protection, standard rails, warning barriers, and signage used properly?

    • Yes
    • No
    • N / A

    Are suspended loads properly secured, and areas beneath flagged to prevent pedestrian or vehicle traffic?

    • Yes
    • No
    • N / A

    Is a spotter in place when suspended loads are in motion?

    • Yes
    • No
    • N / A

    Construction Zones and Mobile Equipment

    Are the work area conditions and presence of barricades, signage, etc., acceptable?

    • Pass
    • Flag
    • Fail

    Is mobile equipment being used properly?

    • Pass
    • Flag
    • Fail

    Are operators authorized and trained to operate the equipment?

    • Yes
    • No
    • N / A

    Excavation/Trenching

    Are excavations and trenches properly sloped, or is a trench box in place?

    • Yes
    • No
    • N / A

    Are all barriers or warnings in place?

    • Yes
    • No
    • N / A

    Tools, Compressed Gas Cylinders, & Guarding

    Are hand and power tools in good condition and properly used?

    • Pass
    • Flag
    • Fail

    Are all guards in place and not bypassed?

    • Pass
    • Flag
    • Fail

    Are cylinders capped when not in use, secured, stored with proper orientation and signage?

    • Yes
    • No
    • N / A

    Confined Space Entry

    Are permits properly completed, safe work practices followed, and monitoring done correctly for confined space entry?

    • Yes
    • No
    • N / A

    Required equipment is present, inspected, in safe working condition, and being used properly, if applicable?

    • Yes
    • No
    • N / A

    Hazard Communication

    Are MSDS/SDS available for onsite chemicals, with proper chemical labeling?

    • Yes
    • No
    • N / A

    Are the chemicals used and stored properly, transported safely, in containment, and disposed of properly?

    • Yes
    • No
    • N / A

    Electrical Safety & Energy Isolation

    Are both permanent and temporary, including those used for welders and other high-load equipment, in safe, serviceable condition? Verify that insulation is intact, there are no cuts, frays, or exposed conductors, strain relief is secure, and any splices or modifications are properly rated, approved, and compliant with applicable electrical and safety requirements.

    • Pass
    • Flag
    • Fail

    Are the Roeslein Equipment-Specific LOTO Procedures available for all equipment that maintenance will be performed on?

    • Yes
    • No
    • N / A

    Are LOTO procedures being followed?

    • Yes
    • No
    • N / A

    Arc Flash

    Are all electrical panels closed when not being actively worked on?

    • Yes
    • No
    • N / A

    Are panels properly labeled when work is completed?

    • Yes
    • No
    • N / A

    Are appropriate clearances maintained and PPE utilized?

    • Yes
    • No
    • N / A

    Environmental

    Is the work area free from negative environmental impacts (trash, waste, energy waste, etc.)?

    • Pass
    • Flag
    • Fail

    Records

    Are training records available for work being performed?

    • Pass
    • Flag
    • Fail

    Are records of inspection available for powered industrial vehicles, cranes, PPE welders, and other related industrial equipment?

    • Pass
    • Flag
    • Fail
Source: Monarch Enterprise (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.