Back

Bulk Folding Table Hydraulics Quarterly PM

The inspection includes checks, adjustments, and preventive measures to ensure hydraulic systems remain in peak condition and minimizing potential issues.
205 Raleigh - Cintas
08/22/2024

Bulk Folding Table Hydraulics Quarterly PM

    *** LOTO Confirmation Statement - DO NOT EDIT/REMOVE ***

    All hazardous energy has been isolated using LOTO procedures?

    All potential stored or residual energy has been relieved, disconnected, restrained, lowered, and/or otherwise rendered safe?

    Lock Out Tag Out

    LOTO Performed

    Food Safety Pre-Check

    Perform LOTO

    Click here to sign

    Check hydraulic fluid - document PSI here

    Inspect for leaks

    • Pass
    • Flag
    • Fail

    Inspect electrical cord, cradle integrity, anchor bolts, safety chain, and hinge pin

    • Pass
    • Flag
    • Fail

    Return to service and verify proper operation

    • Pass
    • Flag
    • Fail

    Food Safety Post-Check

Source: 205 Raleigh - Cintas (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.