AMERICAN STANDARD Platinum 16 Gas/Electric System Maintenance

The AMERICAN STANDARD Platinum 16 Gas/Electric System Maintenance procedure represents the most common items covered in a Checkout Procedure. Confirm all requirements in this document have been met.
MaintainX
04/26/2021

AMERICAN STANDARD Platinum 16 Gas/Electric System Maintenance

11 steps
The AMERICAN STANDARD Platinum 16 Gas/Electric System Maintenance procedure represents the most common items covered in a Checkout Procedure. Confirm all requirements in this document have been met.
  • Final phases of this installation are the unit Operational and Checkout Procedures. To obtain proper performance, all units must be operated and charge adjustments made.

  • Important: Perform a final unit inspection to be sure that factory tubing has not shifted during shipment. Adjust tubing if necessary so tubes do not rub against each other when the unit runs. Also be sure that wiring connections are tight and properly se

  • CHECKOUT PROCEDURE

  • After installation has been completed, it is recommended that the entire system be checked against the following list:

Source: American Standard