Wall-Mounted Vacuum Unit Preventive Maintenance Checklist

It is important to do a Wall-Mounted Vacuum Unit PM Checklist to ensure the unit operates efficiently and safely by keeping suction power and filtration at optimal levels. Regular checks help prevent breakdowns, extend equipment life, and maintain a clean and safe work environment.
Med-Stat
04/23/2025

Wall-Mounted Vacuum Unit Preventive Maintenance Checklist

It is important to do a Wall-Mounted Vacuum Unit PM Checklist to ensure the unit operates efficiently and safely by keeping suction power and filtration at optimal levels. Regular checks help prevent breakdowns, extend equipment life, and maintain a clean and safe work environment.

    Is the unit available for PM?

    if the answer is "oneOf [Unit could be located for PM]"

    Electrical Safety Inspection Checklist

    Select the power source of the device

    if the answer is "oneOf [Electric Powered / Double Insulated with leakage current reading only]"

    Add the Chassis Leakage (Open Ground) reading [uA] ///Upper limit is 300 uA///

    Chassis current leakage limit is 300 µA AC for cord-connected equipment (measurement required only in normal polarity, open ground mode).

    Upload the photo of the Chassis Leakage Reading

    THIS IS A MANDATORY FIELD

    Add or drag pictures

    FINAL ELECTRICAL SAFETY INSPECTION RESULT

    Click PASS only if all requirements are met. Otherwise consult your manager.

    • Pass
    • Flag
    • Fail
    if the answer is "oneOf [Electric Powered / Leakage Current & Ground Resistance Readings Available]"

    Add the Chassis Leakage (Open Ground) reading [uA] ///Upper limit is 300 uA///

    Chassis current leakage limit is 300 µA AC for cord-connected equipment (measurement required only in normal polarity, open ground mode).

    Upload the photo of the Chassis Leakage Reading

    THIS IS A MANDATORY FIELD

    Add or drag pictures

    Add the ground resistance reading [ohms] ///Upper limit is 0.5 ohms///

    Ground resistance from appliance chassis or any exposed conductive surface, to the ground pin of attachment plug must be less than 0.5 ohms.

    Upload the photo of the Ground Resistance Reading

    THIS IS A MANDATORY FIELD

    Add or drag pictures

    FINAL ELECTRICAL SAFETY INSPECTION RESULT

    Click PASS only if all requirements are met. Otherwise consult your manager.

    • Pass
    • Flag
    • Fail

    Inspect exterior of unit for damage/corrosion/cleanliness, clean as needed

    • Pass
    • Flag
    • Fail

    Clean tubing by passing cold disinfection solution through suction canister

    • Pass
    • Flag
    • Fail

    Turn regulator knob and test correlating needle response

    • Pass
    • Flag
    • Fail

    Test regulator at 60mm/hg with calibrated external vacuum gauge (+/-5%)

    • Pass
    • Flag
    • Fail

    Test regulator at 140mm/hg with calibrated external vacuum gauge (+/-5%)

    • Pass
    • Flag
    • Fail

    Test regulator at 200mm/hg with calibrated external vacuum gauge (+/-5%)

    • Pass
    • Flag
    • Fail

    Test regulator at 180mm/hg on "INT" setting; timing module engages between 6-10s; needle moves to and remains at 180mmHg for 14-18s

    • Pass
    • Flag
    • Fail

    Notes / Resolution

    Job / Project Completion Date

    MAKE SURE TO ADD THE DATE YOU PERFORMED THE JOB. PROJECT COMPLETION DATE ON THE WORK ORDERS WILL NO LONGER BE ACTIVE

Source: Med-Stat (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.