Back

Pacific Energy (SWP) Pte Ltd 30070: Weekly Groundwater Inspection

Regular testing is advantageous because it can identify existing problems, ensure the water is suitable for its intended use, track changes over time, and determine the effectiveness of a potential treatment system
MaintainX
04/21/2022

Pacific Energy (SWP) Pte Ltd 30070: Weekly Groundwater Inspection

Regular testing is advantageous because it can identify existing problems, ensure the water is suitable for its intended use, track changes over time, and determine the effectiveness of a potential treatment system

    Date:

    Inspected By:

    MW1 - Workshop - 2.540mm

    • Pass
    • Flag
    • Fail

    MW2 - Lab - 2.730mm

    • Pass
    • Flag
    • Fail

    MW3 - TM’s office - 2.830mm

    • Pass
    • Flag
    • Fail

    MW4 - Gate 2 - 2.910mm

    • Pass
    • Flag
    • Fail

    MW5 - Between G2 & G3 - 3.120mm

    • Pass
    • Flag
    • Fail

    MW6 - Interceptor 4 - 2.170mm

    • Pass
    • Flag
    • Fail

    MW7 - SU4 bund wall - 3.914mm

    • Pass
    • Flag
    • Fail

    MW8 - SU3 bund valve - 2.677mm

    • Pass
    • Flag
    • Fail

    MW9 - Backload pump - 2.865mm

    • Pass
    • Flag
    • Fail

    MW10 - SU5 tankship valve - 2.880mm

    • Pass
    • Flag
    • Fail

    MW11 - SU1 inlet valve - 2.890mm

    • Pass
    • Flag
    • Fail

    MW12 - SU2 outlet valve - 1.565mm

    • Pass
    • Flag
    • Fail

    MW13 - Debunker tank - 1.620mm

    • Pass
    • Flag
    • Fail

    MW14 - Drum Platform - 1.820mm

    • Pass
    • Flag
    • Fail

    MW15 - Car park 1 - 2.930mm

    • Pass
    • Flag
    • Fail

    MW16 - Truck Stop - 1.760mm

    • Pass
    • Flag
    • Fail

    MW17 - Shankar Yard Gate - 1.210mm

    • Pass
    • Flag
    • Fail

    MW18 - Training Room stairs - 2.470mm

    • Pass
    • Flag
    • Fail

    MW19 - Lube store - 2.350mm

    • Pass
    • Flag
    • Fail

    MW20 - Assembly area - 3960mm

    • Pass
    • Flag
    • Fail

    MW21 - SU2 water drain line - 2.540mm

    • Pass
    • Flag
    • Fail

    NOTE: No Longer accessible wells are due to Terminal Structural Developments

    Source: MaintainX (Community Member)

    Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.