Back

WW PM 36-Month DAF to Sludge Pump P-4 by Wilden

This procedure outlines a comprehensive preventive maintenance schedule for the Wilden P-4 sludge pump, typically used in DAF (Dissolved Air Flotation) systems. Every 36 months, the pump undergoes disassembly, inspection, component replacement, and cleaning to ensure continued reliability and performance. This maintenance helps prevent system failures, extending the pump’s lifespan and maintaining efficient operation.
087
05/12/2025

WW PM 36-Month DAF to Sludge Pump P-4 by Wilden

This procedure outlines a comprehensive preventive maintenance schedule for the Wilden P-4 sludge pump, typically used in DAF (Dissolved Air Flotation) systems. Every 36 months, the pump undergoes disassembly, inspection, component replacement, and cleaning to ensure continued reliability and performance. This maintenance helps prevent system failures, extending the pump’s lifespan and maintaining efficient operation.

    Food Safety Pre-Check

    *** LOTO Confirmation Statement - DO NOT EDIT/REMOVE ***

    All hazardous energy has been isolated using LOTO procedures?

    All potential stored or residual energy has been relieved, disconnected, restrained, lowered, and/or otherwise rendered safe?

    Pump Unit

    Food Safety Post-Check

Source: 087 (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.