Omnizone™ Constant Volume Water-Cooled Heat Pump: Air Filter Inspection

This procedure has the recommended guidelines for the maintenance of your unit. The given instruction is only a recommended guideline.
MaintainX
10/24/2021

Omnizone™ Constant Volume Water-Cooled Heat Pump: Air Filter Inspection

This procedure has the recommended guidelines for the maintenance of your unit. The given instruction is only a recommended guideline.

    Check coil baffles for tight fit to prevent air from bypassing the coil. Check panels for air leakage, particularly those sealing the fan and coil compartments. Check for loose electrical connections, compressor oil levels, proper refrigerant charge, and refrigerant piping leaks. Before start-up, be sure all optional service valves are open.

    ome with 4-in. filters. Inspect air filters every 30 days and replace filters as necessary.

    Air Filters

    Replacement filters should have a minimum efficiency rating of MERV 6 per ASHRAE rating procedures and be rated for up to 625 fpm velocity. Job requirements or local codes may specify higher minimum ratings

    • Pass
    • Flag
    • Fail

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.