Back

Walinga Ultra- Veyors (AG) 40 Hours Maintenance

MaintainX
04/26/2021

Walinga Ultra- Veyors (AG) 40 Hours Maintenance

    MAINTENANCE SAFETY

    Follow good shop practices:

    5.1.1 FLUIDS AND LUBRICANTS

    • 1.PNG

    5.1.2 GREASING

    Refer to Section 5.1.1 for recommended grease. Use the Service Record checklist provided to keep a record of all scheduled servicing.

    Fig. 5.2 RESERVOIRS

    Warning: Machine is shown with guard removed for illustrative purpose only. Do not operate machine with guard removed.

    Fig. 5.3 Gearbox

    Warning: Machine is shown with guard removed for illustrative purpose only. Do not operate machine with guard removed.

    Fig. 5.4 OUTBOARD BEARING (if applicable)

Source: Walinga

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.