Sealer Weekly Preventive Maintenance

The procedure encompasses crucial steps to ensure the safe and efficient operation of the sealer equipment.
58Q Graham NC - Cintas
03/05/2024

Sealer Weekly Preventive Maintenance

The procedure encompasses crucial steps to ensure the safe and efficient operation of the sealer equipment.

    *** LOTO Confirmation Statement - DO NOT EDIT/REMOVE ***

    All hazardous energy has been isolated using LOTO procedures?

    All potential stored or residual energy has been relieved, disconnected, restrained, lowered, and/or otherwise rendered safe?

    LOTO REQUIRED

    Remove top guard cover inspect Teflon bands. Replace if necessary. blow out the sealing head with 40 PSI compressed air.

    • Pass
    • Flag
    • Fail

    Wipe Seal Bars Down

    • Pass
    • Flag
    • Fail

    Wipe Down Rollers

    • Pass
    • Flag
    • Fail

    Insure All Nuts/Bolts are Secure.

    • Pass
    • Flag
    • Fail

    Verify Machine Working Correctly.

    • Pass
    • Flag
    • Fail
Source: 58Q Graham NC - Cintas (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.