Back

CLT PM Program -Kaiser Compressor (Compressor Room)- Annual

The CLT PM Program -Kaiser Compressor (Compressor Room)- Annual Inspection Form is mainly to check the safety of your equipment by following LOTO procedures. There's a step-by-step procedure which anyone can easily follow for thorough inspection of your equipment. Essentially, the form helps you in ensuring that your equipment is always at its peak.
MaintainX
04/26/2021

CLT PM Program -Kaiser Compressor (Compressor Room)- Annual

The CLT PM Program -Kaiser Compressor (Compressor Room)- Annual Inspection Form is mainly to check the safety of your equipment by following LOTO procedures. There's a step-by-step procedure which anyone can easily follow for thorough inspection of your equipment. Essentially, the form helps you in ensuring that your equipment is always at its peak.

    Safety

    Did you follow all LOTO procedures?

    • Yes
    • No
    • N / A

    Task Instructions:

    Air-Dryer (Compressor Room)

    List extra parts extra parts and comments here

    Does this equipment pass your inspection?

    • Pass
    • Flag
    • Fail

    Additional comments or reason additional work is needed?

    Add Pictures as needed (additional pictures can be placed in the comments section)

    Add or drag pictures

    Your Name

    Your signature here

    Click here to sign
Source: Conair

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.