Risk and Method statement for Servicing
The Risk and Method Statement for servicing outlines the procedures and precautions to be followed during the servicing of equipment or systems.
Risk and Method statement for Servicing
The Risk and Method Statement for servicing outlines the procedures and precautions to be followed during the servicing of equipment or systems.
Risk Assessment Details
Overall Score
Flagged items
Actions
Site Conducted
Conducted on
Work to commence on
Prepared by
Location
Site Contact
Order Number
Machine manufacturer and model
Serial Number
Method Statement
Add Notes if necessary
Amendments
Please use the following section to make site specific amendments for any unforseen changes to the above methods
Hazard 1
Description of Hazard
Risk Related to Hazard
Who might be harmed?
Risk Likelihood
Risk Consequences
Risk Likelihood x Risk Consequences = Risk Level
if the answer is "oneOf [0-4 = Low (L),5-7 = Medium (M),8-11 = High (H),12-25 = Very High (VH)]"
Show calculation
Are you already doing something to control this risk (existing risk control measure)?
if the answer is "oneOf [Yes]"
Briefly describe the existing control measure:
Resulting Risk Likelihood
Resulting Risk Consequences
Resulting Likelihood X Resulting Consequences = Resulting Risk Level
if the answer is "oneOf [0-4 = Low (L),5-7 = Medium (M),8-11 = High (H),12-25 = Very High (VH)]"
Show calculation
Hazard Score
Risk Matrix
Assessed By
Click here to sign
Date
Total Hazard Score