Back

Building Power - Loss of Building Power (Facilities) ONSITE

In the event of loss of incoming power from National Grid. Facilities procedure
Curve Theatre
02/21/2023

Building Power - Loss of Building Power (Facilities) ONSITE

In the event of loss of incoming power from National Grid. Facilities procedure

    Electrical Intake Room (4th Floor)

    When Power was lost

    Emergency lighting and entrance doors should last for 3 hours from UPS

    • Pass
    • Flag
    • Fail

    Any issues with Emergency Lighting or Main Exit Doors

    • Yes
    • No
    • N / A

    Power Return

    Power Return

    When power returns, all lighting and power should automatically return

    • Yes
    • No
    • N / A

    If Yes, follow Check List 2.

    If No, Follow Check List 1, and then Check List 2.

    Check List 1 - Power Switch On.

    Check List 2 - Building walk check

    Any notes regarding the procedure of power loss

    Click here to sign
Source: Curve Theatre (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.