(UNIVERSAL) Loading Rack Monthly Inspection Procedure

This monthly loading rack inspection confirms gangways, loading arms, piping, valves, and exhaust/blower fans are in good condition, leak-free, and working properly, with housekeeping checked so the rack stays safe and tidy.
AA - Roanoke
12/11/2025

(UNIVERSAL) Loading Rack Monthly Inspection Procedure

    Gangways working properly and not damaged

    • Pass
    • Flag
    • Fail

    Loading arms are operating properly and free of defects

    • Pass
    • Flag
    • Fail

    Loading Arm/Piping/Valves free of leaks/damage

    • Pass
    • Flag
    • Fail

    If applicable, Grease loading spouts and plug valves

    Loading Rack Housekeeping is to EAE's Standard (asphalt not everywhere, tools/gloves picked up/organized, etc.)

    • Pass
    • Flag
    • Fail

    All Exhaust and Blower Fans operating properly for H2S control

    • Pass
    • Flag
    • Fail

    Additional Comments:

Source: AA - Roanoke (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.