Back

AERO® Semi-Custom Central Station Air Handler 39M: 6 months Maintenance

This semi-annual routine maintenance for your unit is for the energy recovery cassettes that includes inpsection and cleaning.
MaintainX
05/03/2021

AERO® Semi-Custom Central Station Air Handler 39M: 6 months Maintenance

2 steps
This semi-annual routine maintenance for your unit is for the energy recovery cassettes that includes inpsection and cleaning.
  • Routine maintenance of the energy recovery cassettes includes inspection and cleaning. On occasion, a part may need to be completely replaced.

  • IMPORTANT: This unit contains an energy recovery wheel heat transfer device. Proper service and maintenance must be conducted as outlined below, or loss of heat transfer and overall system performance will occur.