TRIMACO, LLc PREVENTIVE MAINTENANCE PROCEDURE FS8

MaintainX
04/26/2021

TRIMACO, LLc PREVENTIVE MAINTENANCE PROCEDURE FS8

48 steps
  • MANNING FACILITY

  • EQUIPMENT #: FS8

  • LOCATION: Laminating

  • DUE DATE:

  • FREQUENCY: 120 Days

  • ASSINGED TO:

  • SAFETY!!

  • MAKE SURE MACHINE IS TURNED OFF AND ALL ENERGY SOURCES ARE LOCKED OUT.

  • PM TASK

  • ONLY USE TWO SHOTS OF GREASE PER BEARING.

  • REWIND SECTION

  • TOP TRANSFER SECTION

  • SECONDARY UNWIND (FILM)

  • PRESS SECTION (GLUE)

  • PRIMARY UNWIND (MATERIAL)

  • COMPLETED ON:

  • COMPLETED BY:

Source: Trimaco

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.