Back

Daikin Maverick II IM 1058-8: Monthly Maintenance

This monthly procedure is for the periodic water rinse that your equipment needs. It is recommended for coils that are applied in coastal or industrial environments.
MaintainX
10/24/2021

Daikin Maverick II IM 1058-8: Monthly Maintenance

This monthly procedure is for the periodic water rinse that your equipment needs. It is recommended for coils that are applied in coastal or industrial environments.

    Periodic Clean Water Rinse

    A monthly clean water rinse is recommended for coils that are applied in coastal or industrial environments to help to remove chlorides, dirt and debris. An elevated water temperature (not to exceed 130ºF) will reduce surface tension, increasing the ability to remove chlorides and dirt. Pressure washer PSI must not exceed 900 psig and the nozzel should remain at leat 1 foot from the coil to avoid damaging fin edges.

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.