Back

JLG Vertical Mast 15VPSPI: Battery Charging and Maintenance

Use this battery maintenance checklist to ensure your battery keeps functioning as it should be. This will also help you avoid from getting a new battery by regularly checking your vertical mast.
MaintainX
10/12/2022

JLG Vertical Mast 15VPSPI: Battery Charging and Maintenance

Use this battery maintenance checklist to ensure your battery keeps functioning as it should be. This will also help you avoid from getting a new battery by regularly checking your vertical mast.

    VP Models are equipped with 24 volt, 10 amp output bat- tery chargers (U.S.A. - 120 Volt AC input/60Hz and Brazil - 220 Volt AC input/60 Hz). The battery charger includes a microprocessor controlled automatic charge sensing cir- cuit which can determine cell voltage and regulate charger output as required. The charger automatically ter- minates charging when a full battery charge is acheived. Also a built-in interlock device prohibits driving the machine while the battery charger is plugged in.

    Battery Maintenance and Safety Practices

    As with any wet cell battery, check the electrolyte level of the batteries often, adding only distilled water when required. When fully charged, battery fluid level should be 1/8" below vent tubes.

    Battery Charger Operation

Source: MaintainX (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.